Morongo casino resort spa local regulations

broken image
broken image
broken image

Provide all Structural, Architectural, Mechanical, Plumbing and Control Engineering plans, Project Schedule to be included with contractor submittal package

broken image

The following attachments are included as a part of this RFP:Īttachment A – Proposed Cooling Tower Footing and Framing PlanĪttachment C – Equipment Specifications & Cut SheetsĪttachment D – Condenser Water Piping SchematicĪttachment E – Electrical Single Line DiagramĪttachment F – Proposed Cooling Tower Location

broken image